Mathies Wähner · IT Governance Deutsch
One of five ways of working together

IT landscape assessment and 90-day steering plan

Ten consulting days spread over three to four weeks. At the end you know which IT decision comes first, which can wait and which cannot be made yet, plus a plan for the following 90 days with a sponsor for each decision. Designed for managing directors, executive boards, CFOs and CIOs of organizations with roughly 250 to 1,200 employees.

Single questions, as they arrive
In order, on day 10
  1. Decide first
  2. Then
  3. Can wait
  4. Can wait
  5. Cannot be decided today: what is missing, who has it
Schematic. The order comes from scores, weightings, effort and dependencies, not from a single number.
Ten consulting days

on site and remote, within three to four calendar weeks, at a fixed price.

Ninety-day steering plan

Decisions in sequence, a sponsor for each, three checkpoints.

14 to 18 hours

of your organization's time in total, all participants combined, about four of them with the sponsor.

Result

What you have on day 10

  1. The assessment as a presentation for executive management and as a full report
  2. A rating for each domain, with evidence. A domain is a coherent part of the IT landscape, such as workplace, telephony or ERP; six to eight per organization
  3. An accountability map for the domains examined in depth: who decides, who executes, who carries the risk
  4. The page "What cannot be decided today": for each item, what is missing, who has it and how to obtain it
  5. The 90-day steering plan with a sponsor for each decision. The sponsor is the person in your organization who can make that decision and own it
  6. The decision log from the closing meeting

No technical audit, no implementation, no appraisal of individuals. The report also states what was not examined.

How the ratings are formed
The entry question

Before day one you answer one question: which decision should be possible on day 10? The answer is the first acceptance criterion.

Evidence

Every rating states what it rests on. The report distinguishes what documents show, what interviewees report, what several sources confirm, and what is an assessment. A document proves what it contains, not that anyone follows it; two matching statements make a claim more likely, not certain. So alongside the number of sources, how current and relevant they are matters. As a minimum rule, no rating rests on a single person's statement alone. Indications of serious risk appear in the report.

Facts are checked

Your IT lead reviews the facts in the report on day 9: figures, system names, responsibilities, time periods. Corrections go in before the closing meeting.

The assessment is open to challenge

The assessment is backed by evidence and open to discussion. Where views still differ after review, the decision log records both.

Sequence

Ten consulting days to the assessment, 90 days for the first decisions

  1. Day 0

    Your entry question: which decision should be possible on day 10? Documents requested, sponsor meetings fixed.

  2. Day 5

    Mid-point with the sponsor: first picture, choice of the domains to examine in depth.

  3. Day 10

    Assessment, 90-day steering plan and decision log in the meeting with executive management.

  4. 90 days after

    Your plan: decisions in sequence, a sponsor per decision, three checkpoints you run yourself.

Days 1 to 10 are consulting days, spread over three to four calendar weeks.

On day 5

You choose the two or three domains to examine in depth, usually from the lowest-rated ones, weighted by business criticality.

On day 10

Report, plan and decision log in the meeting with executive management. Decisions made in the meeting are recorded there.

In the 90 days after

A plan you run yourself: decisions in sequence, a sponsor for each, three checkpoints.

Ratings

What an assessment looks like

Schematic with example domains and invented values, no client data. Five controllability ratings (1 to 5), two weightings set by the sponsor, and the steering priority derived from them.
DomainOperational stabilityResponsibility and authorityCapacity boundChange loadRisks and dependenciesBusiness criticalityRelevance for next stepsSteering priority
Workplace5435532watch
Telephony3132354now
ERP531335590 days
Network5355442watch
CRM3133245sponsor decides
Security5554553hold
Providers3153344now
5 controllable4321 not controllableweighting
Seven values per domain

Five controllability ratings, each from 1 to 5 and backed by evidence: operational stability; responsibility and authority; capacity tied up in operations; project and change load; risks and dependencies. Plus two weightings set with the sponsor: business criticality and relevance for the next steps.

How the sequence is set

The steering priority comes from ratings, weightings and an estimate of the change effort, together with dependencies between decisions and dates that are coming anyway, such as contract expirations. The lowest rating is a signal, not automatically the first decision. If a domain rates low and is expensive to change, the sponsor decides on it explicitly.

One value often explains the others

Where a role carries responsibility without the authority to decide, the other values rarely stay stable.

1 · Assessment

The same seven values for every domain, every rating backed by evidence.

2 · Judgment

Which domains are under control with the roles in place, which are not, and which decision comes first, with business criticality, urgency and dependencies in view.

3 · Options

Decisions in sequence with a sponsor for each, plus the page "What cannot be decided today".

Terms

Scope and commercial terms

Scope and price

Ten consulting days within three to four calendar weeks, mostly on site, at a fixed price plus travel; further days on request at the day rate. The offer fits on one page and follows the first conversation.

Your effort

About 14 to 18 hours across all participants: around four with the sponsor, around six with the IT lead, the rest with two or three business unit heads and one or two providers.

Preconditions

A sponsor who can decide on the 90-day plan. An IT lead whom the sponsor has informed in advance. A basic set of documents: org chart, legal entities, project list, provider list with contract end dates, IT budget overview, open problem list.

After handover

One round of factual corrections within ten working days is included: figures, system names, roles, dates. Where views still differ, the report records them.

After day 10

What can follow

The plan is yours; you run the checkpoints yourself. Three follow-ons are possible, each as a separate engagement, when the occasion arises.

If none of these occasions arises, that is a good sign: the plan works with the roles you have.

Contact

Let's talk

If an IT decision is coming up or a role needs covering for a while, send me a note. Two or three sentences about the situation are enough; I reply personally.

mw@mathieswaehner.com

Willich near Düsseldorf, Germany · remote and hybrid · German and English